When To Stop Testing


When To Stop Alpha Testing:

Most common factors helpful in deciding when to stop the testing are:

Stop the Testing when deadlines like release deadlines or testing deadlines have reached
Stop the Testing when the test cases have been completed with some prescribed pass percentage.

Stop the Testing when the testing budget comes to its end.

Stop the Testing when the code coverage and functionality requirements come to a desired level.

Stop the Testing when bug rate drops below a prescribed level

Stop the Testing when the period of beta testing / alpha testing gets over.

Keeping a Track on the Progress of Testing:

Testing metrics can help the testers to take better and accurate decisions; like when to stop testing or when is the application is ready for release, how to track testing progress & how to measure the quality of a product at a certain point in the testing cycle.
The best way is to have a fixed number of test cases ready well before the beginning of test execution cycle. Subsequently measure the testing progress by recording the total number of test cases executed using the following metrics which are quite helpful in measuring the quality of the software product

1) Percentage Completion(Number of executed test cases) / (Total number of test cases)

2) Percentage Test cases Passed:
Defined as (Number of passed test cases) / (Number of executed test cases)

3) Percentage Test cases Failed Defined as (Number of failed test cases) / (Number of executed test cases)

A test case is declared – Failed even when just one bug is found while executing it, otherwise it is considered as – Passed
Scientific Methods to decide when to stop testing:

1) Decision based upon Number of Pass / Fail test Cases:

a) Preparation of predefined number of test cases ready before test execution cycle.

b) Execution of all test cases In every testing cycle.

c) Stopping the testing process when all the test cases get Passed

d) Alternatively testing can be stopped when percentage of failure in the last testing cycle is observed to be extremely low.

2) Decision based upon Metrics:

a) Mean Time Between Failure (MTBF): by recording the average operational time before the system failure.

b) Coverage metrics: by recording the percentage of instructions executed during tests.

c) Defect density: by recording the defects related to size of software like “defects per 1000 lines of code” or the number of open bugs and their severity levels.

Finally How to Decide - Stop the testing, If:

1) Coverage of the code is good

2) Mean time between failure is quite large

3) Defect density is very low

4) Number of high severity Open Bugs is very low.